Real Projects

Real-World Solar & Wind
Case Studies & ROI Results

Explore how Indian industrial facilities unlocked ₹10M+ in 10-year savings, reduced carbon footprints, and optimized renewable energy investments.

Tamil Nadu · Textiles

Textile Factory Solar: ₹8.5Cr Savings in 10 Years

How a 500 kW rooftop solar plant reduced grid tariffs and unlocked tax depreciation benefits

Capacity

500 kW

Rooftop Solar CAPEX

Investment

₹2.6Cr

Payback

4.2y

10Y NPV

₹3.8Cr

CO₂ Avoided

11.2Kt

Yr1 Savings

₹0.85Cr

Project Overview

A 500 kW rooftop solar installation on a ₹400Cr annual revenue textile manufacturing facility in Tamil Nadu's Tirupur district.

Financial Performance

Total Investment: ₹2.6 Crore

Payback Period: 4.2 years

10-Year NPV: ₹3.8 Crore @ 12% discount rate

IRR: 28% (vs. 12% cost of capital)

Annual Savings: ₹85 Lakhs (energy + tax benefit)

Key Drivers

1

Accelerated Depreciation: 40% in Y1 under IT Act — ₹1.04 Cr tax saving

2

Grid Tariff Savings: ₹11/unit vs. ₹4/unit levelised cost

3

Rooftop Space: 3000 m² unutilized warehouse roof

4

State Incentive: 30% subsidy under FAME-II scheme (Tamil Nadu)

Environmental Impact

10-Year CO₂ Avoided: 11,200 tonnes (≈ 500K trees planted)

Carbon Credits: ₹25L potential revenue (I-REC @ ₹225/tCO₂)

Grid Displacement: 2,555 MWh renewable generation

Post-Implementation

The facility's energy cost per unit of textile production dropped by 18%. Post-payback (Y5–Y10), the plant generates 7–9% annualized returns on the original equity, making it a hedge against grid tariff inflation.

Timeline: 6 months design + approvals, 4 months installation, operational since Q3 2023.

"We hit payback faster than we modeled. The tax benefit was the game-changer. Now, it's a renewable energy profit center." — CFO, Tirupur Textile Mills

Karnataka · Auto Components

Automotive Supplier Wind Investment: ₹12.5L Annual Savings

Group Captive Wind: 26% Equity in a 25 MW Wind Farm

Capacity

6.5 MW Equity (26% stake)

Group Captive Wind

Investment

₹1.17Cr

Payback

5.8y

10Y NPV

₹1.56Cr

CO₂ Avoided

18.9Kt

Yr1 Savings

₹0.125Cr

Project Overview

A 26% equity stake in a 25 MW wind farm in Karnataka's Belagaum cluster, serving an automotive component supplier's 45 MWh/month demand.

Financial Structure

Equity Investment: ₹1.17 Crore (6.5 MW capacity share)

PPA Rate: ₹5.0/unit (10-year fixed)

Wind CUF: 35% (above-average site)

Payback Period: 5.8 years

10-Year NPV: ₹1.56 Crore

Annual Savings: ₹12.5 Lakhs vs. grid

Financing Route

70% debt @ 8.5% (SIDBI green loan)

30% equity → your company

Depreciation benefit (accelerated WDV) reduces equity payback to 4.2 years

Why Group Captive?

Lowest per-unit cost: Wind @ 35% CUF beats solar + open access pricing

Long-term certainty: 10-year fixed PPA vs. grid volatility

Equity upside: Post-payback, you own 26% of a renewable asset generating ₹2Cr+ annual gross revenue

Environmental & ESG

10-Year CO₂ Avoided: 18,900 tonnes

Meets Scope 2 Emissions Target: ~40% of purchased electricity is renewable

Carbon Credit Value: ₹42.5L (Gold Standard / I-REC)

Operational

Wind farm is operational, grid-tied in Tamil Nadu with power offtake via drawal rights in Karnataka under open access framework.

Status: Investment closed Dec 2023, dividend payouts began Q2 2024.

"Group captive was the sweet spot — lower cost than RESCO, no capex burden, and real ESG impact for our multinational buyers." — Procurement Head, Automotive Tier-1

Ready to Build Your Own Success Story?

Use our ROI Simulator to model your project, then connect with our team for a detailed site assessment.