Commercial & Technical Proposal

Proposal for 800 kWp
Solar Power Plant

Solar Carport EPC Solution
Client
Life Line Hospital
Adoor, Kerala
Capacity
800 kWp
Grid-Connected
Submitted By
Renovar Energy
(Renovion Energy Pvt Ltd)
Date · Ref
26 August 2026
REN/LLH/SC-800/2026
Section 01

Executive Summary

Renovar Energy is pleased to present this proposal to develop an approximately 800 kWp grid-connected solar PV carport plant for Life Line Hospital, Adoor, Kerala. The proposed solution transforms the hospital's existing parking areas into a productive renewable-energy asset — generating clean power on-site, reducing long-term electricity costs, and reinforcing the hospital's commitment to sustainable operations.

The project will be delivered as a complete turnkey EPC solution by Renovar Energy — a single responsible partner covering design, engineering, procurement, fabrication, installation, testing, commissioning, statutory approvals, warranty coordination and structured post-commissioning support.

Reduction in long-term electricity costs
Productive use of existing parking areas through solar carports
Generation of clean renewable energy on-site
Long-term energy cost optimisation
Professionally engineered solar infrastructure
Complete turnkey execution by one responsible EPC partner
Structured post-commissioning support and O&M
Single-point responsibility through Renovar Energy

Renovar Energy is offering two implementation options, both delivered on a complete turnkey basis with the same overall EPC approach, differing in module sourcing strategy and commercial priority:

Option 1 — Premium
DCR TOPCon Solar Modules + GI/MS Carport Structure

Premium DCR configuration for clients prioritising domestic-module sourcing and procurement assurance.

Option 2 — Value-Optimised
Non-DCR TOPCon Solar Modules + GI/MS Carport Structure

Value-optimised solution with significantly lower upfront investment and procurement flexibility — without compromising the turnkey EPC approach.

Section 02 · Option 1

DCR TOPCon Solar Modules with GI/MS Carport Structure

The DCR configuration represents Renovar's premium offering for Life Line Hospital — combining DCR-sourced TOPCon modules with a robust GI/MS fabricated carport structure and a complete electrical balance-of-system, delivered as a fully integrated turnkey solution.

Scope Highlights

  • DCR TOPCon solar modules
  • GI/MS fabricated solar carport structure
  • Complete electrical BOS
  • Grid-connected inverter system
  • Online monitoring system
  • Installation and commissioning
  • Government / statutory approvals
  • Warranty support
  • Agreed O&M support
Option 1 · DCR

Premium DCR Configuration

DCR TOPCon modules · GI/MS carport · complete turnkey EPC

    Base EPC Project Cost₹3,88,00,000
    GST₹39,57,600
    Total Turnkey Project Cost incl. GST
    ₹4,27,57,600
    Section 03 · Option 2

    Non-DCR TOPCon Solar Modules with GI/MS Carport Structure

    The Non-DCR configuration is Renovar's value-optimised solution — delivering the same complete turnkey EPC approach, the same GI/MS carport infrastructure and the same post-commissioning support framework, with a significantly lower upfront capital investment and greater procurement flexibility.

    Scope Highlights

    • Significantly lower upfront capital investment
    • Procurement flexibility
    • Attractive project economics
    • Faster procurement mobilisation (subject to availability)
    • Same GI/MS carport infrastructure
    • Same complete turnkey EPC approach
    • Complete BOS, installation and commissioning
    • Government / statutory approvals
    • Warranty and support
    Option 2 · Non-DCR

    Value-Optimised Configuration

    Non-DCR TOPCon modules · GI/MS carport · complete turnkey EPC

      Base EPC Project Cost₹2,60,00,000
      GST₹26,52,000
      Total Turnkey Project Cost incl. GST
      ₹2,86,52,000

      The Non-DCR option provides an upfront project cost saving of ₹1,41,05,600 including GST compared with the DCR option — while retaining the same overall turnkey solar carport EPC approach.

      Section 04

      Commercial Comparison

      ParticularOption 1 — DCROption 2 — Non-DCR
      Plant Capacity800 kWp800 kWp
      Solar Modules550 Wp TOPCon DCR550 Wp TOPCon Non-DCR
      Carport StructureGI/MS FabricationGI/MS Fabrication
      Base EPC Project Cost₹3,88,00,000₹2,60,00,000
      GST₹39,57,600₹26,52,000
      Total Project Cost incl. GST₹4,27,57,600₹2,86,52,000
      Saving with Non-DCR Option—₹1,41,05,600
      Commercial recommendation: The DCR option provides a premium DCR module configuration for clients prioritising DCR sourcing and procurement assurance. The Non-DCR option provides a highly attractive value-optimised route, reducing the initial project investment by ₹1,41,05,600 while retaining the same overall turnkey solar carport EPC approach.
      Section 05

      Bill of Quantities

      BOQ — 800 kWp Solar Power Plant at Life Line Hospital. Item 1 varies by option (DCR / Non-DCR modules).

      Sl.Item DescriptionMakeQuantityUOM
      1DCR Solar Modules – 550 Wp TOPConRenew / Goldi / LONGi1,455Nos
      2Module Mounting / GI-MS Carport StructureReputed800kWp
      3Grid-Connected String Inverter – 180 kW classSungrow / InvergyAs requiredNos
      4BOS & Installation – AC/DC Cables, LT Panels, Earthing, Lightning Arrestor, etc.Reputed1Lot
      5Government / Statutory ApprovalsRenovar Energy1Lot
      For Option 2 (Non-DCR): Item 1 becomes “Non-DCR Solar Modules – 550 Wp TOPCon”. Inverter quantity is to be finalised as per engineering design.
      Section 06

      Complete Turnkey EPC Scope

      This proposal is a complete turnkey EPC solution — not merely a supply of solar modules. Renovar Energy holds single-point responsibility across the entire project lifecycle.

      Design and engineering
      Solar PV modules
      Grid-connected inverters
      GI/MS carport fabrication structure
      Electrical BOS
      AC/DC cables
      LT panels
      Earthing
      Lightning protection
      Online monitoring
      Installation
      Testing & commissioning
      Government / statutory approvals
      Safety documentation
      Project documentation
      Client engineer training
      Warranty coordination
      Agreed O&M support

      Single-point responsibility through Renovar Energy — one partner, accountable end-to-end.

      Section 07

      Project Execution Commitment

      Time-Sensitive

      To enable the proposed Non-DCR option and achieve the targeted execution schedule, immediate confirmation is required, with the Purchase Order to be released on or before 10 September 2026.

      60 days
      GI/MS Carport Structure — target completion
      + 30 days
      Balance of Plant (BOP) — target completion thereafter

      The schedule is subject to: timely PO release, advance payment, site handover, material availability, government / statutory approvals, and other project dependencies outside Renovar's reasonable control. This deadline is presented as a genuine requirement to secure procurement and maintain the proposed execution schedule.

      Section 08

      Scope of Work & Responsibility Matrix

      DescriptionResponsibility
      Design and Engineering of the Solar PV System Renovar Energy
      Procurement & Supply of equipment required for the Solar Plant Renovar Energy
      Complete Turnkey Installation, Testing & Commissioning Renovar Energy
      Completion of Statutory, Safety and Project Documentation Renovar Energy
      Training of Client's Engineer on operation of the system Renovar Energy
      Online Monitoring System and associated supply Renovar Energy
      Periodic Quarterly Site Visit and Feedback for 1 Year Renovar Energy
      Service / Replacement of supplied equipment as per agreed OEM warranties Renovar Energy
      Commissioning of Solar PV Plant and Documentation Handover Renovar Energy
      O&M – Cleaning of Solar Modules once every month Renovar Energy
      Government / Statutory Approvals Renovar Energy
      Section 09

      Delivery & Handover

      8 weeks

      Delivery of all major materials — within 8 weeks from the date of Purchase Order placement and receipt of the agreed advance payment, or as mutually agreed between the parties in the final agreement.

      12 weeks

      Installation and commissioning — within 12 weeks, subject to site handover, material availability, statutory approvals and other project dependencies.

      60 + 30

      Carport-specific: GI/MS fabrication structure shall be completed within 60 days, with the Balance of Plant works targeted for completion within the subsequent 30 days.

      Section 10

      Payment Terms

      A milestone-based payment structure aligned with procurement and project execution.

      30%
      Advance along with Purchase Order
      30%
      Against delivery of inverters
      20%
      Against delivery of key BOM items including cables, ACDB, earthing and associated equipment
      10%
      Against delivery of solar modules
      10%
      Against installation and commissioning
      Section 11

      Warranty

      Inverter Warranty
      10 years
      Solar Module Product Warranty
      12 years
      Solar Module Performance / Generation Warranty
      30 years, as per respective OEM warranty terms
      Other Equipment Warranty
      As per respective OEM warranty terms
      Service / Workmanship Warranty
      5 years — applicable to workmanship and quality-related issues attributable to Renovar
      Section 12

      O&M and After-Sales Support

      Renovar's involvement continues well beyond commissioning — providing long-term asset care and operational support.

      Monthly Module Cleaning

      Renovar shall undertake cleaning of the solar modules once every month.

      Quarterly Site Visits

      Periodic quarterly site visits and feedback shall be provided for 1 year from commissioning.

      Online Monitoring

      Online monitoring and associated system supply shall be included.

      Warranty Support

      Renovar shall undertake service / replacement coordination for supplied equipment as per the agreed OEM warranties.

      Section 13

      Government / Statutory Approvals

      Renovar Energy shall be responsible for coordinating and completing the applicable government / statutory approvals required for the Solar PV Plant, subject to the timely provision of required documents and information by the Client.

      Section 14

      Terms & Conditions

      Delivery & Handover
      As specified in Section 09 above.
      Payment Terms
      As specified in Section 10 above.
      Warranty
      As specified in Section 11 above.
      O&M
      As specified in Section 12 above.
      Government Approvals
      As specified in Section 13 above.

      Project Schedule

      The proposed execution schedule is based on immediate confirmation and PO release on or before 10 September 2026. Any delay in PO issuance, advance payment, site handover, statutory approvals, client-side dependencies or matters beyond Renovar's reasonable control may result in a corresponding revision to the project completion schedule.

      Section 15

      Why Renovar

      Single-Point EPC Responsibility

      One accountable partner across the entire project lifecycle.

      Complete Turnkey Execution

      Design, procurement, installation, commissioning and handover — fully integrated.

      Structured Engineering & Procurement

      Disciplined engineering and procurement planning.

      Professional Project Management

      Clear milestones, schedules and communication.

      Transparent Scope & Commercial Terms

      Clearly defined scope, responsibilities and commercials.

      Post-Commissioning Support

      Structured O&M and warranty coordination after handover.

      Warranty Coordination

      Single-window coordination with OEMs for warranty claims.

      Long-Term Asset Performance

      Focus on sustained generation and asset performance.

      Section 16

      Which Option is Right for Life Line Hospital?

      Option 1 — DCR Solution

      Recommended where the hospital places greater importance on:

      • DCR module sourcing
      • Procurement assurance
      • Premium domestic-module configuration
      • Long-term procurement confidence
      Option 2 — Non-DCR Solution

      Recommended where the hospital's priority is:

      • Lower upfront capital investment
      • Procurement flexibility
      • Fast project mobilisation
      • Strong initial project economics
      Upfront Saving with the Non-DCR Option
      ₹1,41,05,600
      including GST

      Both options retain the same overall turnkey EPC approach — GI/MS carport structure, BOS, installation, commissioning, monitoring, approvals and agreed support framework — subject to the applicable module configuration.

      Section 17

      Recommended Commercial Message

      Life Line Hospital now has two clear pathways to proceed with its solar carport investment: a premium DCR configuration for maximum DCR sourcing assurance, or a highly value-optimised Non-DCR configuration offering a substantial reduction in upfront investment. Renovar Energy is prepared to execute either option on a complete turnkey basis, allowing the hospital to select the solution that best aligns with its procurement and investment priorities.
      Section 18

      Closing

      Renovar Energy is committed to delivering Life Line Hospital a reliable, professionally engineered and fully integrated solar carport solution, backed by clear commercial terms, defined execution responsibility and structured post-commissioning support.

      We look forward to partnering with Life Line Hospital in transforming its available parking infrastructure into a productive renewable-energy asset and delivering long-term value through solar power.

      Upon confirmation and receipt of the Purchase Order by 10 September 2026, Renovar Energy will initiate project mobilisation, engineering and procurement activities to support the proposed execution timeline.

      Renovar
      Renovar. Energy
      Renovion Energy Pvt Ltd · Kochi, Kerala, India
      Proposal Ref: REN/LLH/SC-800/2026
      Date: 26 August 2026
      Validity subject to PO by 10 September 2026

      This proposal is confidential and prepared exclusively for Life Line Hospital, Adoor. All commercial figures are inclusive of applicable GST and represent fixed turnkey EPC project costs. Terms are subject to mutual agreement and final contract execution. Equipment makes are indicative and subject to availability at the time of procurement; final selection shall be confirmed during engineering.