Group Captive Solar Proposal

Powering Precot with
10.3 MW of captive solar

A 25-year group captive solar structure delivering ₹144.77 Cr in gross energy savings, a 29.8% investment IRR, and a 5-year payback — hedging Precot against rising grid tariffs.

₹7.46 Cr
Initial Investment
incl. refundable deposit
29.8%
Investment IRR
pre-tax, 25-yr
5 Years
Payback
on captive cost
₹144.77 Cr
25-Yr Gross Savings
vs. KSEB grid
Prepared by Renovar EnergyExecutive decision view · 25-year pre-tax model
Scroll or use ↑ ↓ to navigate↓
01

The Opportunity for Precot

Energy-intensive operations

Spinning and dyeing units run continuously on heavy motor loads — grid power is among the largest operating cost lines for a cotton mill.

Rising KSEB tariffs

Grid tariffs escalate ~5% annually. Over 25 years, the year-1 tariff of ₹6.30/unit climbs past ₹20/unit, widening the savings gap every year.

Tariff certainty

A group captive solar contract locks a predictable solar tariff (₹4.50/unit, +2.5%/yr) — insulating margins from utility volatility and regulatory surprises.

Sustainability mandate

Global retail and brand partners increasingly demand renewable energy in the supply chain. Captive solar makes Precot cotton products measurably greener.

02

The Group Captive Solution

A group captive model lets Precot own a share of a dedicated solar plant and consume its energy at a contracted tariff — without building or operating the plant itself. It is the cleanest way for an energy-intensive manufacturer to lock long-term renewable savings with minimal capex and no operational burden.

1

Usolar builds & operates the solar plant

A 10.3 MW solar asset is developed, financed and operated by Usolar at an off-site location within the same state discom area.

2

Precot invests in captive equity + deposit

Precot contributes ₹4.12 Cr captive equity and ₹3.34 Cr refundable security deposit — meeting the 26% group captive ownership rule.

3

Energy wheeled to Precot

Generated units are wheeled through the grid to Precot meters. Precot pays a solar tariff instead of the full grid tariff.

4

Savings flow every year for 25 years

The spread between the grid tariff and the locked solar tariff is the gross saving — compounding as grid tariffs rise.

03

Investment Structure

Captive Investment Cost
26% group captive equity stake
₹4.12 Cr
Security Deposit (refundable)
Refunded in Year 25
₹3.34 Cr
Total Initial Investment
₹7.46 Cr

The security deposit is refundable in Year 25 and is factored into the Year 25 cash flow. No debt is applied — the structure is fully equity-funded on the client side.

Plant at a glance

System size
10.3 MW
Annual generation
15.04 MUs
Module degradation
0.7% / yr
Contract term
25 years
Year-1 grid tariff
₹6.30 / unit
Year-1 solar tariff
₹4.50 / unit
04

Model Inputs & Assumptions

All 25-year cash-flow figures in this proposal are derived from the inputs below. Tariffs and charges follow Kerala SLDC / KSEB group captive norms.

INPUT — GROUP CAPTIVE SOLAR MODEL

Prepared by Renovar
Client namePRECOT
System size10.3MW
Generation15,038,000kWh/year
Module degradation0.7%per year
Grid tariff₹ 6.30Rs/unit
Grid escalation5.0%per year
Wheeling & transmission charge0.49Rs/unit
Charge escalation2.0%per year
Grid support charge5.0%percent
Transmission & wheeling loss3.2%percent
Tentative solar tariff₹ 4.50Rs/unit
Solar tariff escalation2.5%per year
Voltage level110 kVtype
SLDC charge rate₹ 104₹/MW/month
Annual SLDC charge₹ 12,854at 110 kV
Energy received at client91.80%percentage

INVESTMENT & FINANCING INPUTS

AssumptionInput valueGuidance
Equity contribution per MW₹ 4,000,000
Captive investment cost₹ 41,200,00026% of equity
Security deposit₹ 33,372,000Refundable · 6 months
05

How the Savings Work — Year 1

Grid tariff (KSEB)
Year 1, escalates 5%/yr
₹6.30/unit
Solar tariff
Locked, escalates 2.5%/yr
₹4.50/unit
Solar tariff after losses
Adjusted for 8.2% plant losses
₹4.90/unit
Wheeling & transmission
Per unit
₹0.49/unit
Final solar tariff at client
Landed cost
₹5.39/unit
Savings per unit
₹0.91/unit

Year-1 economics

Across 1,38,04,884 usable units

KSEB grid cost₹8.70 Cr
Group captive cost₹7.44 Cr
Year-1 savings₹1.25 Cr

The gap widens every year: grid tariffs rise 5% annually while the solar tariff rises only 2.5%, so savings compound — reaching ₹12,43,71,911 in Year 25 alone.

06

Grid vs Solar Tariff — 25-Year Outlook

Cost per unit (₹/unit)

Grid +5%/yr · Solar +2.5%/yr
Y1Y2Y3Y4Y5Y6Y7Y8Y9Y10Y11Y12Y13Y14Y15Y16Y17Y18Y19Y20Y21Y23Y25₹0₹6₹12₹18₹24Breakeven · Year 5
  • Grid tariff (KSEB)
  • Solar tariff (captive)
Breakeven (payback)
Year 5

Cumulative savings recover the full ₹7.46 Cr initial investment. Every year after is net upside.

Year 1 gap
₹0.91/unit
Grid ₹6.3 vs Solar ₹5.39
Year 25 gap
₹10.66/unit
Grid ₹20.32 vs Solar ₹9.65
Tariff divergence over 25 yrs

Grid rises 223% while solar rises only 79% — the widening spread is the savings engine.

Tariff milestones

YearGrid ₹/unitSolar ₹/unitSaving ₹/unitYearly savingsStatus
16.305.390.91₹1.25 CrRecovering
57.665.941.72₹2.30 CrBreakeven
109.776.713.07₹3.97 CrNet savings
1512.477.574.90₹6.13 CrNet savings
2015.928.557.37₹8.90 CrNet savings
2520.329.6510.66₹12.44 CrNet savings
25-year total savings₹144.77 Cr
07

25-Year Savings & Cash Flow

Cumulative net savings (₹ Cr)

Starts at −₹7.46 Cr (investment), crosses zero at Year 5 (breakeven), then accumulates net profit.

Break-even · Year 5
Y1Y2Y3Y4Y5Y6Y7Y8Y9Y10Y11Y12Y13Y14Y15Y16Y17Y18Y19Y20Y21Y23Y25-50050100150

Annual KSEB cost vs group captive cost (₹ Cr)

The gap between the two bars is each year's saving. KSEB rises 5%/yr; solar rises only 2.5%/yr — so the gap widens every year.

Y1Y2Y3Y4Y5Y6Y7Y8Y9Y10Y11Y12Y13Y14Y15Y16Y17Y18Y19Y21Y23Y2506121824
  • KSEB cost (+5%/yr)
  • Group captive cost (solar +2.5%/yr)
08

Returns, IRR & Payback

Initial investment
₹7.46 Cr
Cash outflow at Year 0 incl. security deposit
Investment IRR
29.8%
Project cash flows over Year 0–25, pre-tax
Payback
5 years
Cumulative savings recover initial investment
25-yr gross savings
₹144.77 Cr
Allocated savings vs. KSEB grid
Year-1 savings
₹1.25 Cr
First full year of operation
Year-25 savings
₹12.44 Cr
Final year, before deposit refund

*IRR is pre-tax and excludes depreciation benefits. The security deposit (₹3.34 Cr) is refunded in Year 25 and included in that year cash flow. All figures are illustrative, based on client-provided grid tariff rates and standard group captive assumptions.

Kerala · Group Captive
10

Power Adjustment & Energy Banking

Solar generation from the group captive plant is injected into the Kerala grid and accounted against the captive consumer's electricity consumption. The flow below shows how each unit travels from generation to final settlement.

Solar Generation
Grid Injection
5% Grid Support Charge / Net Energy Accounting
Time-Block Energy Adjustment
Same Billing Period Consumption
Surplus Energy
Banking / Carry Forward
Subsequent Adjustment
End-of-Settlement Surplus
APPC / Applicable Settlement

Key distinctions

Generated

Energy produced by the 10.3 MW solar plant at the meter.

Injected

Energy fed into the Kerala grid and measured at the injection point.

Net energy

Injected energy after the 5% grid support charge — available for adjustment.

Consumed

Energy used by the captive consumer within the applicable billing period.

Banked

Surplus net energy carried forward to a later billing period.

Charge 1 of 2
11

The 5% Grid Support Charge

Of the energy injected into the Kerala grid, 5% is accounted as the Grid Support Charge. The balance 95% is the net energy available for adjustment against consumption. This is a grid-usage charge — not the banking charge.

Worked example

Gross energy injected1,000 kWh
Grid Support Charge @ 5%− 50 kWh
Net energy available for accounting950 kWh

Do not confuse the two 5% charges

The Grid Support Charge is applied once at the point of injection. The Banking Charge is a separate 5% applied only on surplus energy carried across a billing period.

Grid Support Charge ≠ Banking Charge
Most favourable treatment
12

Same-Time-Period Adjustment

Where net renewable energy injected during a particular time period is consumed during the same time period and within the same billing period, the treatment is more favourable. Under the applicable Kerala regulation, energy fully consumed in the same time period is exempt from transmission / wheeling charges and applicable losses — it is adjusted unit-for-unit against consumption.

Example

Net energy injected (normal hours)1,000 kWh
Consumed in the same time period1,000 kWh
Adjusted against consumption1,000 kWh

No banking needed

The consumer does not need to bank energy that can be consumed and adjusted within the applicable same time period — it is settled directly, avoiding banking charges entirely.

Charge exemption

Energy fully consumed in the same time period is exempt from transmission / wheeling charges and applicable losses, making this the most efficient use of captive solar.

Regulatory adjustment factors
13

Cross-Time-Period Adjustment

Kerala's framework provides specific adjustment factors where energy generated in one time block is used to offset consumption in another. These are regulatory adjustment mechanisms — not additional generation. They change how much consumption a given injection can offset.

Illustrative adjustment factors

Energy Injection PeriodConsumption PeriodIllustrative Adjustment
Same time periodSame time period100%
Non-peakPeak80%
PeakPeak100%
PeakOther time blocks120% treatment (as applicable)
Other non-peakOther non-peak100%

Subject to the prevailing Kerala regulations. Factors are accounting mechanisms, not generation.

Commercial meaning

Injecting 1,000 kWh during a non-peak period and using it to offset peak-hour consumption:

Net injected (non-peak)1,000 kWh
Adjustment @ 80%× 0.80
Peak-hour offset800 kWh

1,000 kWh injected does not always equal 1,000 kWh of peak-hour offset.

The core concept
14

What 'Banking' Actually Means

Banking occurs when eligible renewable energy remaining after the applicable energy adjustment within a billing period is carried forward for use in a subsequent billing period, subject to the applicable Kerala regulations and banking charges.

1

Solar energy is generated

2

Energy is injected into the grid

3

Applicable grid support adjustment is applied

4

Energy is first accounted against eligible consumption

5

If surplus remains, it becomes banked energy (subject to eligibility)

6

Banked energy is carried forward to a subsequent billing period

7

When used, the applicable adjustment / settlement rules apply

8

At end of settlement, remaining banked energy is settled per prevailing regulations

Charge 2 of 2
15

The 5% Banking Charge

The applicable banking mechanism provides for a 5% banking charge on surplus energy banked beyond the relevant billing period, where applicable. It is charged only once on energy that is actually banked — not on energy adjusted within the same billing period.

Visual callout

Gross injected energy
5% Grid Support Charge
Net energy
If surplus crosses billing period
5% Banking Charge
Net banked energy

Worked example

Surplus energy available for banking1,000 kWh
Banking charge @ 5%− 50 kWh
Net banked energy950 kWh
Do not apply the 5% banking charge twice

The banking charge is applied once to surplus energy that is actually banked. Energy adjusted within the same billing period is not subject to it.

Illustrative only
16

Full Worked Example

A simple billing-period illustration using round numbers to show how grid support, consumption adjustment and banking interact.

One billing period

Solar energy injected10,000 kWh
Grid support charge @ 5%− 500 kWh
Net energy9,500 kWh
Eligible consumption during the period8,000 kWh
Surplus1,500 kWh
Banking charge @ 5%− 75 kWh
Net banked energy1,425 kWh
Opening banked balance
1,425 kWh

becomes the starting banked balance available for subsequent adjustment, subject to the applicable regulations and time-block / settlement rules.

Illustrative only

This example uses round numbers to explain the mechanics. It is not a project billing calculation and does not reflect the actual 10.3 MW plant's generation or Precot's consumption profile.

09

Why Renovar

Renovar Energy designs, builds and operates renewable energy assets for industrial consumers across South India. We specialise in group captive and open-access solar structures that help manufacturers like Precot convert volatile grid costs into predictable, long-term savings.

End-to-end EPC and O&M across South India
Group captive structuring and regulatory compliance
25-year performance guarantees and asset management
Transparent, audit-ready financial modelling
Renovar

Let's power Precot's next chapter

Reach out to our team to take this proposal forward.

Nithin Mathews
Director – Projects | Co-Founder
+91 9497292273nithin.mathews@renovar.energy
Yadhu Krishnan
Director – Technical | Co-Founder
+91 9847686068yadhu@renovar.energy

Prepared by Renovar Energy for Precot · Confidential · 2026 · Illustrative figures based on the 25-year pre-tax group captive model